الصفحة الرئيسية >  Term: Available but not needed capability
Available but not needed capability

Net capability of main generating units that are operable but not considered necessary to carry load and cannot be connected to load within 30 minutes.

0 0

المنشئ

  • Harry8L
  • (London, United Kingdom)

  •  (V.I.P) 574128 النقاط
  • 100% positive feedback
© 2026 CSOFT International, Ltd.