الصفحة الرئيسية > Term: schedule variance
schedule variance
The difference between the budgeted cost of work performed (BCWP) and the budgeted cost of work scheduled (BCWS). This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled.
- قسم من أقسام الكلام: noun
- المجال / النطاق: كمبيوتر
- الفئة: Components; تطوير برامج
- Company: مايكروسوفت
0
المنشئ
- Romain
- 44.44% positive feedback