الصفحة الرئيسية > Term: power ascension
power ascension
The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.
- قسم من أقسام الكلام: noun
- المجال / النطاق: طاقة
- الفئة: فحم; الغاز الطبيعي; بنزين
- Company: EIA
0
المنشئ
- Pud6
- 100% positive feedback