الصفحة الرئيسية > Term: critical path
critical path
(1) The processing path that takes the longest time to complete of all parallel paths in a process instance, where each path considered begins at a start node or an input to the process and ends at a stop node.
(2) The sequence of activities that determines the earliest date at which a project can be completed. The length of this path changes as activities or tasks are completed earlier or later than the original schedule.
- قسم من أقسام الكلام: noun
- المجال / النطاق: البرامج
- الفئة: خدمة برمجيات العولمة
- Company: IBM
0
المنشئ
- Jessehe
- 40.13% positive feedback