الصفحة الرئيسية >  Term: waste-filled stopes
waste-filled stopes

In these methods, support for walls and for workers and machines is furnished by waste rock, tailing sand, etc., called filling or gob. In true waste filling, the orebody is excavated in sections alternating with filling, and it is sometimes referred to as cut-andfill stoping.

0 0

المنشئ

  • ed.young
  • (Milwaukee, United States)

  •  (V.I.P) 21084 النقاط
  • 100% positive feedback
© 2026 CSOFT International, Ltd.